卷簾門施工工藝程序
Construction process procedure of rolling shutter door
(1)手動(dòng)卷簾門工藝程序:定位、放線一安裝卷筒一安裝手動(dòng)機(jī)構(gòu)一簾板與卷筒連接一安裝導(dǎo)軌一試運(yùn)轉(zhuǎn)一安裝防護(hù)罩。
(1) Process procedure of manual rolling shutter door: positioning and setting out - Installation of drum - Installation of manual mechanism - connection between curtain plate and drum - Installation of guide rail - Test Run - Installation of protective cover.
(2)電動(dòng)卷簾門工藝程序:定位、放線_安裝卷簡(jiǎn)一安裝電機(jī)、減速器一安裝電氣控制系統(tǒng)一空載試車一簾板與卷筒連接_安裝導(dǎo)軌一安裝水幕噴啉系統(tǒng)一試運(yùn)轉(zhuǎn)一安裝防護(hù)罩。
(2) Process procedure of electric rolling shutter door: positioning and setting out_ Installation of winding sheet - Installation of motor and reducer - Installation of electrical control system - no-load commissioning - connection between curtain plate and winding drum_ Install the guide rail, install the water curtain spraying system, test run and install the protective cover.
2.定位放線卷簾門安裝方式有洞內(nèi)安裝、洞外安裝、洞中安裝三種。即卷簾門裝在門洞內(nèi),簾片向內(nèi)側(cè)卷起;卷簾門裝在門洞外,簾片向外卷起和卷簾門裝在門洞中,簾片可向外側(cè)或向內(nèi)側(cè)卷起。因此,定位放線時(shí)應(yīng)根據(jù)設(shè)計(jì)要求彈出兩導(dǎo)軌垂直線及卷簡(jiǎn)線并測(cè)量洞口標(biāo)高。定位放線后,應(yīng)檢查實(shí)際預(yù)埋鐵件的數(shù)量、位置與圖紙核對(duì),如不符合產(chǎn)品說(shuō)明書的要求,應(yīng)進(jìn)行處理。
2. There are three installation modes of positioning and setting out roller shutter door: installation inside the tunnel, installation outside the tunnel and installation in the tunnel. That is, the rolling shutter door is installed in the door opening, and the curtain sheet is rolled up to the inside; The rolling shutter door is installed outside the door opening, the curtain sheet is rolled outward, and the rolling shutter door is installed in the door opening, and the curtain sheet can be rolled outward or inward. Therefore, during positioning and setting out, the vertical lines of the two guide rails and the winding center line shall be snapped according to the design requirements, and the elevation of the opening shall be measured. After positioning and setting out, the quantity and position of the actual embedded iron parts shall be checked and checked with the drawings. If they do not meet the requirements of the product manual, they shall be handled.
濟(jì)南卷簾門
3.安裝卷筒安裝卷筒時(shí),應(yīng)使卷筒軸保持水平,并使卷筒與導(dǎo)軌之間距離兩端保持一致,卷筒臨時(shí)固定后進(jìn)行檢查,調(diào)整、校正合格后,與支架預(yù)埋鐵件用電焊焊牢。卷筒安裝后應(yīng)轉(zhuǎn)動(dòng)靈活。
3. Install the drum. When installing the drum, keep the drum shaft horizontal and keep the distance between the drum and the guide rail consistent at both ends. After the drum is temporarily fixed, check it. After adjustment and correction are qualified, weld it firmly with the embedded iron parts of the support by electric welding. The drum shall rotate flexibly after installation.
4.簾板安裝簾板事先裝配好,再安裝在卷筒上。門簾板有正反向,安裝時(shí)要注意,不得裝反。
4. Curtain plate installation the curtain plate shall be assembled in advance and then installed on the drum. The door curtain plate has positive and negative directions. Attention shall be paid during installation, and it shall not be installed reversely.
5.安裝導(dǎo)軌按圖紙規(guī)定位置線找直、吊正軌道,保證軌道槽口尺寸準(zhǔn)確,上下一致,使導(dǎo)軌在同一垂直平面上,然后用連接件與墻體上的預(yù)埋鐵件焊牢。
5. Install the guide rail, align and hang the rail according to the position line specified in the drawing, ensure that the size of the rail notch is accurate and consistent up and down, make the guide rail on the same vertical plane, and then weld it firmly with the embedded iron parts on the wall with connectors.
6.安裝水幕噴淋系統(tǒng)防火卷簾門應(yīng)安裝水幕噴淋系統(tǒng)。水幕噴淋系統(tǒng),應(yīng)與總控制系統(tǒng)連接。安裝后,應(yīng)試驗(yàn)。
6. Install the water curtain spraying system. The fireproof rolling shutter door shall be installed with the water curtain spraying system. The water curtain spray system shall be connected with the main control system. After installation, the test shall be carried out.
7.試運(yùn)轉(zhuǎn)先手動(dòng)試運(yùn)行,再用電動(dòng)機(jī)啟閉數(shù)次,調(diào)整無(wú)卡住、阻滯及異常噪聲等現(xiàn)象為合格。
7. The test run shall be conducted manually first, and then the motor shall be opened and closed for several times. It is qualified if there is no jamming, block and abnormal noise.
8.安裝卷筒防護(hù)罩
8. Install the drum guard
以上的精彩內(nèi)容就是小編今天為您提供的內(nèi)容,更多的精彩內(nèi)容來(lái)自: 濟(jì)南卷簾門詳情請(qǐng)點(diǎn)擊我們的網(wǎng)站關(guān)注:http://bankrobot.cn
The above wonderful content is what Xiaobian provides for you today. More wonderful content comes from Jinan roller shutter door. For details, please click our website to pay attention to: http://bankrobot.cn

閱讀/ Recommended reading

  在濟(jì)南的街頭巷尾,卷簾門是商鋪、車庫(kù)的 “衛(wèi)士”,但偶爾它也會(huì) “鬧脾氣” 突然打不開,讓人束手無(wú)策。無(wú)論是清晨急著開店?duì)I業(yè),還是傍晚想將愛車停進(jìn)車庫(kù),卷簾門故障都令人頭疼...

卷簾門VS傳統(tǒng)門鎖:一場(chǎng)空間與的“隱形較量” 2025-06-16
耐用卷簾門挑選指南:從材質(zhì)到結(jié)構(gòu)的考量 2025-06-14
工廠適用的卷簾門有什么特殊性嗎? 2025-06-12
倉(cāng)庫(kù)卷簾門該如何選擇呢? 2025-05-27
濟(jì)南卷簾門怎么做到防銹效果? 2025-05-14
濟(jì)南卷簾門是怎么用心做產(chǎn)品的呢? 2025-05-09
淺析防火卷簾門應(yīng)用時(shí)的注意事項(xiàng) 2025-05-07
不想讓卷簾門耽誤時(shí)間,來(lái)了解卷簾門有哪些規(guī)范吧 2025-05-06
熟女亚洲一区二区三区| 女人又爽 又黄 的入口| 欧美日本国产韩国在线观看| 亚洲男人天堂色| 男女日韩欧美在线| 久久久久久国产精品免费无码| 综合久色| 日韩欧美不卡一级电影| 97永久免费视频| 欧美国产精品中文字幕| 欧美一卡二卡三卡四本| 亚洲日韩伦理aⅴ| 办公室抽插小穴无码| 一级片操大美女大骚逼| 色哟哟你懂的在线观看| 色综合久久久久久久久久| 国产美国日本一区二区三区| 婷婷基地在线婷婷| 美女操逼网免| 老鸭窝av免费播放| 亚洲精品 密码久久久久久| 久久精品极品少妇| 人妻 日本在线 中文字幕| 亚洲A V无码中文精品一区| 啪啪啪黄污日韩| 亚洲精品88av视频| 亚洲性色av一区二区黑丝袜| 午夜无码福利av| 成人熟女视频一区二区三区图片| 激情欧美五月视频| 久久久久一区二区黄色| 殴美伊人超碰| 黄色国产一区二区| 欧美日韩国产在线不卡91| 老司机一区二区三区在线视频| 草久欧美日韩视频| CaoPern超碰国产一区| 无套大鸡巴插进去日出水| 欧美黄片一区A| 精品69久久免费视频| 黄色麻豆AV|