
濟南富強門業(yè)有限公司
聯(lián)系人:林經(jīng)理
電話:151 6888 2846
郵箱:527800164@qq.com
地址:濟南市歷下區(qū)化纖廠路8號3號樓101號
帶你了解濟南卷簾門安裝流程
濟南卷簾門的安裝需遵循規(guī)范流程,結(jié)合當(dāng)?shù)貧夂蛱攸c(如多風(fēng)、多雨)確保結(jié)構(gòu)穩(wěn)固、運行順暢,具體流程如下:
The installation of rolling shutter doors in Jinan needs to follow standardized procedures, combined with local climate characteristics (such as windy and rainy) to ensure stable structure and smooth operation. The specific process is as follows:
安裝前的準備工作是基礎(chǔ)。需根據(jù)門洞尺寸(寬度、高度)核對卷簾門的型號、規(guī)格,確保簾片長度、卷軸直徑與門洞匹配,檢查簾片、導(dǎo)軌、電機等部件是否完好,無變形、破損。清理門洞周邊環(huán)境,移除雜物、障礙物,保證安裝空間充足,尤其是頂部和兩側(cè)需預(yù)留足夠位置安裝卷軸、電機和導(dǎo)軌。測量門洞的垂直度和水平度,用卷尺檢查左右兩側(cè)門洞高度差,若偏差超過 5mm,需用水泥砂漿找平,避免因門洞不平整導(dǎo)致卷簾門運行卡頓。同時準備好安裝工具,如電鉆、沖擊鉆、扳手、水平儀、卷尺等,以及膨脹螺栓、連接片等輔助材料,確保型號適配。
The preparation work before installation is the foundation. Firstly, it is necessary to verify the model and specifications of the rolling shutter door based on the size of the door opening (width, height), ensuring that the length of the curtain and the diameter of the scroll match the door opening. Check whether the curtain, guide rail, motor and other components are intact, without deformation or damage. Clean up the surrounding environment of the door opening, remove debris and obstacles, ensure sufficient installation space, especially reserve enough space on the top and both sides to install scrolls, motors, and guide rails. Measure the verticality and levelness of the door opening, and use a tape measure to check the height difference between the left and right sides of the door opening. If the deviation exceeds 5mm, it needs to be leveled with cement mortar to avoid the roller shutter door running stuck due to uneven door opening. At the same time, prepare installation tools such as drills, impact drills, wrenches, level gauges, tape measures, as well as auxiliary materials such as expansion bolts and connecting pieces to ensure model compatibility.
接下來進行導(dǎo)軌與支架安裝。導(dǎo)軌需垂直固定在門洞兩側(cè)的墻體上,先用鉛筆根據(jù)測量標記出導(dǎo)軌的安裝位置,確保兩側(cè)導(dǎo)軌平行且與地面垂直,用水平儀校準后,用電鉆在墻體上鉆孔,植入膨脹螺栓,將導(dǎo)軌與墻體固定牢固,螺栓間距約 500mm,靠近上下兩端的螺栓需加密,增強穩(wěn)定性。對于鋼結(jié)構(gòu)門洞,可采用焊接方式固定導(dǎo)軌,焊接點需做防銹處理。隨后安裝卷軸支架,支架需固定在門洞頂部的墻體或橫梁上,保證兩個支架對稱分布,中心間距與卷軸長度匹配,支架底部需用水平儀找平,確保卷軸安裝后能水平轉(zhuǎn)動,避免因傾斜導(dǎo)致簾片受力不均。
Next, proceed with the installation of the guide rail and bracket. The guide rail needs to be vertically fixed on the walls on both sides of the door opening. First, use a pencil to mark the installation position of the guide rail according to the measurement, ensuring that both sides of the guide rail are parallel and perpendicular to the ground. After calibration with a level, use an electric drill to drill holes in the wall and implant expansion bolts to firmly fix the guide rail to the wall. The bolt spacing is about 500mm, and the bolts near the upper and lower ends need to be tightened to enhance stability. For steel structure door openings, welding can be used to fix the guide rails, and the welding points need to be treated with rust prevention. Subsequently, install the scroll bracket, which needs to be fixed on the wall or crossbeam at the top of the door opening to ensure symmetrical distribution of the two brackets, with the center distance matching the length of the scroll. The bottom of the bracket needs to be leveled with a level to ensure that the scroll can rotate horizontally after installation, avoiding uneven force on the curtain due to tilting.
卷軸與簾片組裝是核心環(huán)節(jié)。將卷軸水平放置在支架上,用螺栓固定,卷軸兩端需伸出支架一定長度,便于安裝軸承和電機。安裝軸承時確保與卷軸同心,轉(zhuǎn)動靈活無卡滯。隨后將簾片逐片連接,簾片之間的掛鉤需扣合緊密,連接處涂抹少量潤滑油,保證升降順暢。將組裝好的簾片與卷軸連接,固定時需確保簾片在卷軸上分布均勻,起始端需牢固固定,防止升降時打滑。對于帶電機的卷簾門,需在卷軸一端安裝電機,電機輸出軸與卷軸通過聯(lián)軸器連接,連接后手動轉(zhuǎn)動卷軸,檢查是否有異響或卡頓,確保傳動順暢。
The assembly of scrolls and curtains is the core process. Place the scroll horizontally on the bracket and secure it with bolts. Both ends of the scroll should extend a certain length from the bracket to facilitate the installation of bearings and motors. When installing the bearing, ensure that it is concentric with the spool and rotates flexibly without any jamming. Then connect the curtain pieces piece by piece, and the hooks between the curtain pieces should be tightly fastened. Apply a small amount of lubricating oil to the connection to ensure smooth lifting. Connect the assembled curtains to the scroll, ensuring that the curtains are evenly distributed on the scroll during fixation. The starting end should be firmly fixed to prevent slipping during lifting. For roller shutter doors with motors, a motor needs to be installed at one end of the spool. The motor output shaft is connected to the spool through a coupling, and the spool is manually rotated after connection to check for any abnormal noise or jamming, ensuring smooth transmission.
電機與控制系統(tǒng)安裝需精準操作。根據(jù)電機型號連接電源線和控制線,電源線需選用符合功率要求的銅芯線,穿管保護后接入配電箱,控制線連接控制盒(如按鈕開關(guān)、遙控接收器),確保接線正確,避免短路。安裝控制盒時,需固定在便于操作的位置(如門洞側(cè)方 1.5 米高度處),遠離水源和潮濕環(huán)境。調(diào)試電機正反轉(zhuǎn),按下上升按鈕,簾片應(yīng)平穩(wěn)上升;按下下降按鈕,簾片應(yīng)垂直下降,若方向相反需調(diào)換電源線相位。同時安裝限位器,通過調(diào)整限位開關(guān)的位置,設(shè)定簾片上升到頂和下降到底的極限位置,防止過度運行導(dǎo)致電機過載或簾片損壞。
The installation of motors and control systems requires precise operation. Connect the power cord and control cord according to the motor model. The power cord should be made of copper core wire that meets the power requirements. After being protected by conduit, it should be connected to the distribution box. The control cord should be connected to the control box (such as button switches and remote control receivers) to ensure correct wiring and avoid short circuits. When installing the control box, it should be fixed in a convenient position for operation (such as 1.5 meters high on the side of the door opening), away from water sources and humid environments. Debug the motor for forward and reverse rotation, press the up button, and the curtain should rise smoothly; Press the descent button, and the curtain should descend vertically. If the direction is opposite, switch the phase of the power cord. At the same time, install limiters and adjust the position of the limit switch to set the limit position for the curtain to rise to the top and fall to the bottom, in order to prevent motor overload or curtain damage caused by excessive operation.
進行整體調(diào)試與固定。手動或電動操作卷簾門升降數(shù)次,觀察簾片是否與導(dǎo)軌貼合緊密,無偏移、卡滯現(xiàn)象,若發(fā)現(xiàn)簾片與導(dǎo)軌摩擦,需微調(diào)導(dǎo)軌位置。檢查各連接部位的緊固情況,尤其是卷軸支架、導(dǎo)軌固定螺栓,用扳手逐個加固,防止松動。對于底部的簾片,需安裝防撞裝置(如橡膠條),避免下降時撞擊地面損壞簾片。清理安裝現(xiàn)場的工具和廢料,檢查卷簾門的密封性,縫隙過大處可加裝密封毛條,增強防風(fēng)防雨性能。
Finally, perform overall debugging and fixation. Manually or electrically operate the rolling shutter door up and down several times, observe whether the curtain is tightly attached to the guide rail without any deviation or jamming. If friction is found between the curtain and the guide rail, adjust the position of the guide rail slightly. Check the fastening of each connecting part, especially the fixing bolts of the scroll bracket and guide rail, and reinforce them one by one with a wrench to prevent loosening. For the bottom curtain, anti-collision devices (such as rubber strips) need to be installed to avoid damaging the curtain when it hits the ground during descent. Clean up the tools and waste materials at the installation site, check the sealing of the rolling shutter door, and install sealing strips in areas with large gaps to enhance wind and rain resistance.
本文由濟南卷簾門友情奉獻.更多有關(guān)的知識請點擊:http://bankrobot.cn真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會陸續(xù)向大家奉獻.敬請期待.
This article is a friendly contribution from Jinan Rolling Shutter Doors For more information, please click: http://bankrobot.cn Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.
閱讀/ Recommended reading
- 濟南卷簾門 “罷工” 別慌!解鎖應(yīng)急處理全攻略 2025-07-03
- 卷簾門VS傳統(tǒng)門鎖:一場空間與的“隱形較量” 2025-06-16
- 耐用卷簾門挑選指南:從材質(zhì)到結(jié)構(gòu)的考量 2025-06-14
- 工廠適用的卷簾門有什么特殊性嗎? 2025-06-12
- 倉庫卷簾門該如何選擇呢? 2025-05-27
- 濟南卷簾門怎么做到防銹效果? 2025-05-14
- 濟南卷簾門是怎么用心做產(chǎn)品的呢? 2025-05-09
- 淺析防火卷簾門應(yīng)用時的注意事項 2025-05-07
濟南卷簾門的安裝需遵循規(guī)范流程,結(jié)合當(dāng)?shù)貧夂蛱攸c(如多風(fēng)、多雨)確保結(jié)構(gòu)穩(wěn)固、運行順暢,具體流程如下: The installation of rolling shutter...